Hybrid Two-Stage Planning for Food Industry Overproduction Waste Minimisation

Research Area:
Eco-Intelligent Manufacturing

Year:
2007

Publication:
International Journal of Production Research

SMART Authors:
Shahin Rahimifard


See all publications

Convenience food manufacture generates considerable waste due to the planning of production being undertaken based upon forecasted orders. This problem is particularly acute for products that have a very short shelf-life and are subject to considerable volatility in demand, such as ready-meals. Overproduction wastes (OPWs) typically result in finished products being disposed of through commercial waste channels, which is both costly for manufacturers and represents poor and unsustainable use of resources. This paper reports on a hybrid two-stage planning technique for the reduction of OPW by utilizing the advantages offered through both static and dynamic approaches to production scheduling. The application of this planning approach to a case study ready-meal manufacturer through the development of commercially available planning software is also described.

PDF download View Publication